Temporary Builders Supply in the Sutherland Shire: step by step

  1. Find the right spotWe look at the site plan, slope and access and choose a place for the supply that won't get in the way.
  2. Book it inWe lodge what Ausgrid needs and tell you what to ask your retailer for.
  3. Install and connectWe install the temporary pole or board, connect and test it.
  4. Swap to permanentOnce the new meter board is ready, the house goes live and the site pole comes out.

Every Shire knockdown rebuild, major extension and granny flat build needs power from day one. Running leads from the neighbour’s house or relying on generators slows the trades and creates safety problems. A temporary builders supply gives the site a proper metered connection to the Ausgrid network, with safety switches and outlets for tools, lighting and the site shed.

What gets installed

Most residential sites use a temporary pole or a freestanding site board near the front boundary. It carries a meter, main switch, safety switches and weatherproof outlets, and connects overhead from the nearest street pole or underground from a pit where the street mains are underground. On steep Shire blocks we pick the flattest practical spot near the street, clear of excavators, concrete pumps and scaffold.

Getting the order right

The smoothest builds follow a simple order:

  1. Permanent disconnection of the old house before demolition
  2. Temporary supply set up the same visit
  3. The build runs on site power
  4. Permanent supply connected to the new meter board
  5. Temporary supply removed

Our power disconnection and reconnection page covers step 1. If the new home will have a pool, ducted air and an EV charger, lodge the three phase power application early.

What we need

  • Site address and builder contact
  • Site plan or a sketch showing where things go
  • Single or three phase
  • Start date
  • A retailer account for the site

Bush blocks and access

Builds on bush blocks in Engadine, Heathcote, Illawong and Bundeena often have narrow access, slopes and trees close to the street. We work out where the supply can stand safely, away from vegetation and out of the path of machinery. Builds near the coast get fittings that cope with salt.

Common hold-ups

Most site power delays come from paperwork: no retailer account, the pole placed where the excavator needs to dig, single phase ordered when the build needs three phase, or demolition booked before the disconnection. We run through these with you and the builder at the start.

Moving it mid-build

When the driveway is about to be poured or landscaping starts, the temporary supply sometimes has to move. We can relocate it with a short disconnection if we know a few days ahead.

At the end

Once the new meter board is in, we connect the permanent supply, test and certify, then remove the temporary pole or board. If the new home is going underground, the overhead to underground conversion trench goes in before landscaping.

Single or three phase on site

Most house builds run fine on single phase site power. Bigger builds, or homes that will be three phase when finished, often start on three phase so the crane, hoist or larger tools have the supply they need and the street capacity is confirmed early.

Granny flat builds

A granny flat build at the back of an existing home sometimes runs from the house supply for small jobs. For anything bigger, a separate temporary supply is safer and keeps the house’s own circuits free. We’ll advise based on the size of the build.

Neighbours and shared driveways

On tight Shire sites, the temporary supply may need to sit near a shared driveway or a neighbour’s fence. We place it so it’s clear of their access and their car, and tell you if anything needs agreeing with them before the build starts.

Book site power

Builders across level 2 electrician Kirrawee, Menai and Miranda use us for site power. Call the Sutherland Shire level 2 electricians to book.

Updated

Temporary supply is priced on the pole or board type, single or three phase, the connection point and how the supply is removed or converted to permanent at the end. We confirm on site.

What good temporary builders supply looks like

Close-up of temporary builders supply on a home in the Sutherland Shire area
What temporary builders supply looks like up close on a typical Sutherland Shire area home.
Signs that temporary builders supply needs attention
Typical signs that it needs attention.

Temporary Builders Supply questions in the Sutherland Shire

Something else on your mind? Call 02 9158 9999 and ask.

Our block is steep. Where does the temporary pole go?

Usually near the street on the flattest practical spot, where it's clear of excavation and concrete pumps. We plan it with your builder.

Can a granny flat build run off the main house?

Sometimes for small jobs, but larger builds are safer and simpler with their own site supply. We'll advise.

Who arranges the meter?

You open a retailer account for the build address, and the retailer arranges the meter. We give you the wording to use.

Need a Level 2 electrician in the Shire?

📞 Call now Free quote