Power Disconnection and Reconnection Sutherland Shire
The supply isolated safely at the network for roofers, renderers, builders and electricians, then reconnected when they're done.
Power Disconnection and Reconnection in the Sutherland Shire: step by step
- Agree the datesWe book around your roofer's, builder's or electrician's schedule.
- Notify AusgridWe lodge the notification before touching the supply.
- Isolate safelyWe disconnect at the pole, pit, private pole or attachment and make it safe.
- Reconnect or removeTemporary jobs are reconnected and tested; demolitions have the service removed.
Your main switch turns off your circuits, but the service line, the bracket or raiser and the mains to your meter board stay live. When anyone works close to them, the supply has to be isolated on the network side. That’s a Level 2 job, and in the Shire it comes up constantly: re-roofs, renders, renovations, switchboard upgrades and knockdown rebuilds.
Re-roofing and painting
Shire homes from the 60s and 70s are reaching the age where terracotta and concrete tile roofs are being replaced with metal, and brick is being rendered or painted. Roofers work right next to the raiser, and painters and renderers on scaffold get close to the bracket and line. We disconnect for the days they need, then reconnect. If the raiser is rusted, which near the coast it often is, we replace it at reconnection with a point of attachment upgrade.
Renovations and extensions
Second storeys, rear extensions and new kitchens often move the meter board or change the supply. Builders call us to disconnect, then to reconnect once the new attachment and mains are in place.
Pools
Pool excavations sometimes come close to underground supplies or private lines across the yard. If the pool builder needs the supply isolated or a line moved, we handle it.
Switchboard work
When your electrician replaces the switchboard or main switch, the network supply has to be isolated. We coordinate so the disconnection, their work and the reconnection all happen the same day.
Demolitions
Before a knockdown, the supply has to be permanently disconnected and the service removed. We can set up a temporary builders supply on the same visit so the builder has power from day one.
Private poles and shared supplies
On bush blocks and long properties, your supply may come through a private pole, and on some older subdivisions one pole feeds more than one house. We check how the supply is arranged before booking so the right point is isolated and neighbours are told if they’re affected.
Timing
A planned disconnection usually takes less than an hour, and a reconnection about the same. The lead time is in booking the day around your trades and lodging the Ausgrid notice, so a few days’ warning helps. If you’re tenanting the property, we can give you a written notice to pass on.
For builders and trades
We work with Shire roofers, builders, painters and electricians every week. Send the address, the job and your dates and we’ll book it in.
Coastal reconnections
On homes near the beaches and bays, the reconnection is the moment to look hard at the raiser, the clamp and the meter box glands, because salt has usually been working on them since the house was built. If anything is corroded, we tell you before we reconnect and price the replacement, so you’re not paying for a second disconnection a year later when it fails.
Pools and landscaping crews
Excavators digging for pools and retaining walls sometimes work close to underground consumer mains that nobody has located. If you have an underground supply and a dig is planned, we can identify where the cable runs and isolate it if the crew needs to work near it.
Paperwork for your site
Builders and roofers often need proof that the supply was isolated for their safety plan. We give you the date, time and point of isolation in writing, along with the certificate of compliance after reconnection.
Book a disconnection
Call your level 2 electrician Sutherland Shire team. For an immediate safety issue, our emergency level 2 electrician line is open 24/7.
Updated
What good power disconnection and reconnection looks like
Power Disconnection and Reconnection questions in the Sutherland Shire
Something else on your mind? Call 02 9158 9999 and ask.
Our roofer wants the power off for three days. Do we have to go without power?
Usually the supply is off while the roofers are working near the line, and we can often reconnect at the end of each day if the work allows. We plan it with the roofer.
Our supply comes through a private pole. Is the disconnection different?
Sometimes it's made at the private pole rather than the house. We check how your supply is arranged before booking.
Is switching off the main switch enough for the painters?
No. The line and mains to the meter board stay live. If painters or renderers are working near them, the supply needs isolating at the network side.